14-week calibration cycles for colony rovers on loose heterogeneous deposits. Torque, pressure benchmarks from ag-mech diagnostics. 99.4% uptime target.
| Component | Spec | Interval |
|---|---|---|
| Tire pressure | 18.5 psi ±0.2 | Weekly |
| Drive torque | 320 Nm peak | 14-week audit |
| Regolith layer depth | variable loose deposits | Pre-mission |